The actions within this strategy are divided into two categories:
Action we will DOActions we will SUPPORTAction we will do are followed by “DO” and are colored in dark gray, and actions we will support are followed by “SUPPORT” and are colored in light gray.
Learn more about how we get thereBikeways provide clear benefits to the users of them, but often provide additional benefits to those who travel along the same corridor. Examples include traffic calming and reduced speeds of vehicles which lowers the risks and severity of crashes along those corridors. Including additional elements like greening along bikeways provides multiple benefits, like more protection to the bicyclists, helping to capture rainwater before it enters the stormwater system, creating habitat for birds and other small animals, and providing visual interest for people traveling along the corridor, no matter the mode of travel.
Design protected bikeways to accommodate access to the curb for the mobility impaired, working directly with the Minneapolis Advisory Committee on People with Disabilities and the broader disability community to test and monitor designs.
Safety Equity Mobility
Low
2020-2023 (Years 0-3)
Successfully completed to date and on-going
Public Works has worked with the Minneapolis Advisory Committee on People with Disabilities and other disability organizations on testing street and bikeway designs. This includes reviewing the design of curb-protected bikeways adjacent to on-street parking on 11th Ave South near Gold Medal Park and reviewing the design and placement of tactile edges between sidewalks and sidewalk-level bikeways on Hennepin Avenue and 4th Street in downtown Minneapolis.
Incorporate median islands and intersection treatments into protected bikeways and neighborhood greenways that benefit people walking as they cross streets.
Safety Mobility
Bicycles 4.2
Medium
2020-2023 (Years 0-3)
Successfully completed to date and on-going
Median islands and intersection treatments such as raised crossings have been incorporated into many protected bikeway projects including Plymouth Avenue North, the Whittier Lyndale bikeway, Johnson Street Northeast, Bryant Avenue South, etc.
Install greening and stormwater infrastructure elements along trails, protected bike lanes and neighborhood greenways.
Climate Prosperity Mobility Active Partnerships
Design 4.1, Design 4.2, Design 4.3
Medium
2020-2023 (Years 0-3)
Successfully completed to date and on-going
The City is installing greening and stormwater infrastructure elements along bikeways where feasible, including native plantings, trees, and bio-retention areas.
Integrate public realm or public art projects into bikeway features to reflect the community when appropriate.
Prosperity
Medium
2024-2027 (Years 4-7)
Successfully completed to date and on-going
Public realm was expanded as part of the Hennepin-Dunwoody and Hennepin-1st Avenue projects. Public Works is exploring incorporation of public art into the Northside Greenway and Grand Rounds Missing Link bikeway projects, currently in planning phases.