Strategy 8 Design bikeways using best practices that reflect the community and serve as an asset to people who may not currently ride a bike or use micromobility.

Previous Strategy:
Strategy 7
Next Strategy:
Strategy 9

The actions within this strategy are divided into two categories:

Action we will DOActions we will SUPPORT

Action we will do are followed by “DO” and are colored in dark gray, and actions we will support are followed by “SUPPORT” and are colored in light gray.

Learn more about how we get there

Bikeways provide clear benefits to the users of them, but often provide additional benefits to those who travel along the same corridor. Examples include traffic calming and reduced speeds of vehicles which lowers the risks and severity of crashes along those corridors. Including additional elements like greening along bikeways provides multiple benefits, like more protection to the bicyclists, helping to capture rainwater before it enters the stormwater system, creating habitat for birds and other small animals, and providing visual interest for people traveling along the corridor, no matter the mode of travel.

  • Toronto – King Street jersey barriers

    Toronto – King Street jersey barriers

  • 3rd Ave bike planters

    3rd Ave bike planters

Actions

Actions to design bikeways using best practices that reflect the community and serve as an asset to people who may not currently ride a bike or use micromobility.

Bicycling 8.1

Design protected bikeways to accommodate access to the curb for the mobility impaired, working directly with the Minneapolis Advisory Committee on People with Disabilities and the broader disability community to test and monitor designs.

Supported goals:

Safety Equity Mobility

Related actions:

 

Difficulty:

Low

Timeframe:

2020-2023 (Years 0-3)

Status:

Successfully completed to date and on-going

Significant milestone(s):

Public Works has worked with the Minneapolis Advisory Committee on People with Disabilities and other disability organizations on testing street and bikeway designs. This includes reviewing the design of curb-protected bikeways adjacent to on-street parking on 11th Ave South near Gold Medal Park and reviewing the design and placement of tactile edges between sidewalks and sidewalk-level bikeways on Hennepin Avenue and 4th Street in downtown Minneapolis.

Bicycling 8.2

Incorporate median islands and intersection treatments into protected bikeways and neighborhood greenways that benefit people walking as they cross streets.

Supported goals:

Safety Mobility

Related actions:

Bicycles 4.2

Difficulty:

Medium

Timeframe:

2020-2023 (Years 0-3)

Status:

Successfully completed to date and on-going

Significant milestone(s):

Median islands and intersection treatments such as raised crossings have been incorporated into many protected bikeway projects including Plymouth Avenue North, the Whittier Lyndale bikeway, Johnson Street Northeast, Bryant Avenue South, etc.

Bicycling 8.3

Install greening and stormwater infrastructure elements along trails, protected bike lanes and neighborhood greenways.

Supported goals:

Climate Prosperity Mobility Active Partnerships

Related actions:

Design 4.1, Design 4.2, Design 4.3

Difficulty:

Medium

Timeframe:

2020-2023 (Years 0-3)

Status:

Successfully completed to date and on-going

Significant milestone(s):

The City is installing greening and stormwater infrastructure elements along bikeways where feasible, including native plantings, trees, and bio-retention areas.

Bicycling 8.4

Integrate public realm or public art projects into bikeway features to reflect the community when appropriate.

Supported goals:

Prosperity

Related actions:

 

Difficulty:

Medium

Timeframe:

2024-2027 (Years 4-7)

Status:

Successfully completed to date and on-going

Significant milestone(s):

Public realm was expanded as part of the Hennepin-Dunwoody and Hennepin-1st Avenue projects. Public Works is exploring incorporation of public art into the Northside Greenway and Grand Rounds Missing Link bikeway projects, currently in planning phases.